Translate

Showing posts with label JSF F-35. Show all posts
Showing posts with label JSF F-35. Show all posts

Monday, March 6, 2017

Bids For Permanent Fleet to Replace CF-18s Expected in 2019

By: David Pugliese, The National Post 

The Liberal government plans to request bids for a new fleet of fighter jets as early as 2019, which would coincide with the next federal election.

That move, along with the push by the Liberals to have the first of the interim Super Hornet fighter aircraft delivered by that year, could help blunt criticism about bungled military procurements and delays in buying a new jet, say military insiders and analysts.

Public Services and Procurement Canada confirmed the 2019 date for the release to industry of the request for proposals for the permanent fighter fleet.

The department also noted the government expects a deal in place by the end of 2017 or early 2018 to acquire the 18 Boeing Super Hornets as an interim measure. The Liberal government has been pushing to get the first of those planes delivered some time in 2019, industry sources say.

Defence analyst Martin Shadwick said such moves could provide political cover for the Liberals. “It could be politically useful in an election year to have both in the works,” said Shadwick, who teaches strategic studies at York University in Toronto. “That’s a pretty good way to buy some political insulation.”

Shadwick said if the first Super Hornets arrive during the election year, that in particular would be a tangible event the Liberal government could highlight.

The Liberals had promised during the last campaign to purchase a replacement for the CF-18 jet fleet, pointing out that it would go for a cheaper alternative to the controversial F-35 stealth fighter that had been selected by the Conservative government.

That’s a pretty good way to buy some political insulation

Defence Minister Harjit Sajjan announced in November the government’s decision to begin negotiations to buy 18 Boeing Super Hornets as “interim” fighter jets until a permanent fleet for the existing CF-18 aircraft could be bought.

The Liberals said Canada is facing a capability gap because it doesn’t have enough jets to fulfil its military missions, a situation Sajjan has blamed on the previous Conservative government for bungling the project to replace the aging CF-18s.

Canadian CF-18 Hornet flies beside two Portuguese F16 Flying Falcons over Lithuania on Sept. 15, 2014.
Cpl Gabrielle DesRochers/DNDA 
The Liberals’ upcoming Defence Policy Review will also contain details on the project to acquire a permanent replacement fleet for the CF-18s.

“These requirements will include the number of aircraft needed, the level of in-service support required and the estimated time of delivery,” noted the recently released update from Public Services and Procurement Canada. “Planning for the competition is already underway, and we anticipate a request for proposals will be issued in 2019.”

But the Liberal plan to buy the Super Hornets has come under fire from retired Royal Canadian Air Force generals, who say it is too costly. They argue the Liberals should cancel the Super Hornet deal and proceed immediately to a competition to buy permanent replacements for the CF-18s.

Jordan Owens, a spokeswoman for Sajjan, said the government is continuing with its negotiations on the Super Hornets. “The Royal Canadian Air Force faces a significant challenge because it does not have the number of fighter aircraft available to meet Canada’s NORAD and NATO obligations if called to do so simultaneously,” Owens said.

Critics, including the Conservatives and some retired officers, have disputed that position and questioned whether there is such a gap.

The Liberals have reversed their position somewhat on the F-35. They now say they will hold an open competition for the permanent fleet of fighter jets and that Lockheed Martin is welcome to propose the F-35.

Tuesday, December 6, 2016

Bezan: Liberal’s fighter jet capability gap becomes a credibility gap


Conservative Party defence critic James Bezan submitted this opinion piece on the Liberal government’s decision to purchase Super Hornet fighter jets as an interim measure to deal with what they say is a fighter aircraft capability gap:

By James Bezan

As the Liberals attempt to rationalize their sole-source deal of Boeing’s Super Hornet fighter jets, their credibility gap on the file continues to widen.

Justin Trudeau’s credibility on the issue first took a hit when he made an impossible campaign promise. He committed to holding an open and fair competition to replace Canada’s CF-18 fighter jets while simultaneously excluding the F-35. Aside from the fact that this promise is self-contradicting; to directly inject politics into a decision of this magnitude is disheartening.

In June, the National Post revealed that the Liberals intended to purchase an interim fleet of fighter jets to fill a so-called ‘capability gap’. However, in April, Lieutenant-General Hood, the Commander of the Royal Canadian Air Force, confirmed to Members of Parliament that Canada’s fleet of CF-18s are able to meet our current NORAD and NATO commitments and will be able to do so confidently until 2025.

The day before the Liberals announced their intention to enter into negotiations with Boeing, officials from the Department of National Defence reconfirmed Lieutenant-General Hood’s comments in writing.

However, in a recent Senate appearance before the Senate, Lieutenant-General Hood attempted to clarify the government’s position, confirming what critics had long expected – the Liberals created their own capability gap. Prior to concluding the Liberals’ Defence Policy Review, Prime Minister Trudeau gerrymandered the policy of jet requirements to fit with his own political views.

The commander of the RCAF was not privy to the decisions behind this policy change as it was a purely political move enforced by the Prime Minister’s office.

By purchasing the Super Hornets now, the Liberals have jeopardized any hope of a fair competition moving forward. Of course with 18 of their jets already purchased by the Government of Canada, Boeing will have a guaranteed edge over any competitor.

The Liberals have promised to launch a five-year ‘open and transparent’ process to replace the entire fleet of fighter jets. Experts agree this amount of time is unnecessary. In fact, The Netherlands, Norway, and South Korea each ran an open and fair competition for their fighter jets and not one lasted more than two years.

Not only is the Liberals’ decision to sole-source the Super Hornet unnecessary, their approach to the process has been unethical.

In the lead up to the Liberal’s announcement, Boeing representatives appeared to have been given preferential access to Cabinet Ministers. Lobbyists from Boeing met with members of the government seven times more often than any of their competitors. Other companies had their meeting requests denied.

To make matters worse, Prime Minister Trudeau is forbidding federal employees from speaking out against this cynically political process. He has placed an unprecedented life-time gag-order on all 235 individuals working on the Future Fighter Capability Project. This is a blatant attempt on the part of the Liberals to silence their own critics so that they can move ahead with this politicized partisan procurement.

This uninformed campaign promise could also impact Canada’s reputation as a reliable ally. As more than 10 of Canada’s allies have committed to 5th generation fighters in the F-35, Canada will be one of the last developed nations to be flying 4th generation

fighters.

With fewer capabilities and less in common with our allied partners, the RCAF will be less likely to be called upon for international operations.

A key component of the Liberal’s misguided campaign promise was that they would buy a cheaper alternative to the F-35. But we don’t know the price of the Super Hornets.

Prime Minister Trudeau is giving Boeing a blank cheque. Operating an interim fleet comes with significant additional costs on infrastructure, training, and maintenance.

If the Liberals continue with their commitment to operate a mixed fleet of fighters, the RCAF’s capabilities and interoperability will be reduced for years to come. The Liberal’s plan would force our current fleet of fighters to fly beyond their current 2025 life expectancy into 2030, which the Department of National Defence has accessed as a high-risk option.

This highlights the Prime Minister’s naïve approach to the needs of our military and his inability to manage our country’s finances. Earlier this month Kuwait purchased 40 Super Hornets at $335 million apiece, five times more expensive than the $65 million the Liberals promised during the election.

In addition to hitting every taxpayer’s pocketbook, the Liberals’ political strategy could cost thousands of Canadian aerospace workers their jobs. There are currently 70 companies across Canada that have already benefited from over $1 billion worth of contracts under Lockheed Martin’s F-35 program. If executed, the Liberals’ sole-sourced deal with Boeing could put these jobs in jeopardy.

By ignoring the experts, in a desperate attempt to fulfill a campaign promise, the Liberals have created a political mess of their own doing. Prime Minister Trudeau needs to acknowledge that fighter jets are not just for simply ‘whipping out to show how big they are’. They serve an integral part in maintaining our national security and sovereignty, and are essential to our status as a reliable ally.

The Prime Minister needs to realize that this decision is larger than himself. He should listen to the experts and cancel this sole-sourced deal before his credibility gap has consequences for Canadian taxpayers, aerospace workers, and our military.

Monday, December 5, 2016

Williams: 3 ways the Liberals are making a mess of Defence Procurement

By: Allan Williams,

The government’s strategy to replace Canada’s CF-18s is reflective of a government that either has no comprehension of how to conduct the business of defence procurement, or understands the business all too well but has put political expediency ahead of the best interests of the military.

There are three fundamental problems with the decision to sole-source for 18 “interim” Super Hornets:

• First, whether or not you believe there is a “capability gap,” the fact is that an open, fair and transparent competition can be concluded within one year. Normally, a competition could take up to four years: two years for the military to prepare its statement of requirements (SOR) and two years for the civilian authorities to conduct the competition.

In this instance, a shortened time period is feasible. The military’s SOR has already been prepared. In its current form, it is wired or fixed so that only the F-35 could bid successfully to replace our current jets. However, these biased criteria are few in number and easily modifiable to ensure fairness to all suppliers. As such, it would take no more than a few weeks to redraft the SOR. In addition, over the past six years, the potential suppliers have been visited, have filled out questionnaires and have been subject to inspection ad nauseam. This consultative time need not be repeated. The process can easily be concluded within 12 months.

• Second, the “interim” solution is illegal. The government is wrong when it claims that an “urgent” need allows it to bypass competition. The specific wording in article 506.11(a) in the Agreement on Internal Trade reads in part: “Where an unforeseeable sense of urgency exists …” Note the word “unforeseeable.”

Bad planning is not an excuse for sole-sourcing. A “capability gap” that was allowed to grow over many years is hardly “unforeseeable.” The article was designed to allow for sole-sourcing in the event, for example, that the government announced that it was sending our troops into a theatre of operation and there would be insufficient time to conduct competitions to provide the troops with the goods and services they require. Surely, it is not unreasonable for us to hold our government leaders accountable for obeying the law.

• Finally, a problem with acquiring the Super Hornets is the incremental cost of such an option. The capital budget of the Department of National Defence is already stretched to its limit. To impose upon it an extra burden of billions of dollars is unconscionable and unnecessary.

It’s very easy to identify the losers in this flawed strategy. The government, for its galling hypocrisy; the military, as its capital budget is pressured and it is forced to endure another decade without a long-term replacement of its jets; us taxpayers, as it is our billions of dollars being squandered; and Canadian industry now deprived of high-quality jobs that would have been guaranteed under a competition.

However, this delaying tactic does produce two winners. First, Boeing and its shareholders for having been given a multi-billion dollar gift. Second, ironically and undoubtedly much to the chagrin of the prime minister, Lockheed Martin. The F-35 would have a much harder time winning a competition now than it will in five years. While it has been declared operational by the U.S. Marines and Air Force, the fact is that not all software has been installed. Five years from now, I have little doubt, all the software will have been implemented with the bugs worked out.

Furthermore, in five years the unit price for the jet will have continued to decline.

To borrow from Shakespeare, the Liberal party may find itself “hoist with (its) own petard.”
---
Alan Williams is a former assistant deputy minister of matériel at the Department of National Defence. He is now president of The Williams Group providing expertise in the areas of policy, programs and procurement. He has authored two books, Reinventing Canadian Defence Procurement: A View From the Inside; and Canada, Democracy and the F-35.

Wednesday, November 23, 2016

Plan for stop-gap Super Hornets leaves question of Cost Unanswered

By: Lee Berthiaume and Steve Lambert, Canadian Press 

OTTAWA — The federal government unveiled its interim steps Tuesday in the long-fraught effort to replace Canada's aging fleet of fighter jets, but key questions — how much it would cost taxpayers and the impact on the military — remained up in the air.

Following a closed-door cabinet meeting on Parliament Hill, three Liberal cabinet ministers held a news conference to announce plans to enter into discussions with U.S. aerospace giant Boeing to purchase 18 Super Hornet jets.

At the same time, however, the government intends to launch an open competition starting next year to replace all 77 of the air force's CF-18s — a process that's expected to last up to five years.

The ministers described buying the 18 Super Hornets as a necessary stop-gap to ensure Canada has enough planes to fill a so-called "capability gap" — enabling it to both fulfil its NATO obligations and to defend North American interests.

"We need additional planes as soon as possible for an interim period," said Defence Minister Harjit Sajjan, flanked by Public Procurement Minister Judy Foote and Innovation Minister Navdeep Bains.

"Having a new squadron of interim aircraft will mitigate those risks significantly as we address the capability gap."

The Hornet, the ministers said, is both compatible with the U.S. and currently operational — the unspoken implication being that the F-35 remains in development, even though the U.S. Air Force declared it operational in the summer.

And even as they repeatedly highlighted the urgent need for new planes, the ministers refused to say much the government expects the Super Hornets to cost to buy and operate.

During last year's election campaign, the Liberals pegged the cost of a single F-35 — the vaunted and controversial stealth fighter favoured by the previous Conservative government — at $175 million, compared with $65 million for one Super Hornet.

But Kuwait recently announced plans to buy 40 Super Hornets for $13 billion. Even with eight of them specially equipped for electronic warfare, that still works out to $335 million per plane.

At the same time, Denmark is moving ahead with plans to buy 27 F-35s at a cost of $4 billion, which amounts to about $148 million per plane.

Then there's the compatibility issue: a government-appointed expert panel and the military's research branch determined in separate reports that it would be extremely expensive for Canada to operate two types of fighter jets, given the different training, infrastructure and supporting equipment required.

Sajjan sidestepped questions about the supposed savings promised by the Liberals during last year's election campaign.

"We want to go through an appropriate process to determine all the costings," he said, "but at the same time, making sure that we fill the capability gap while we look to the long term of replacing our fighter fleet as well."

Foote, meanwhile, wouldn't say what would happen if Boeing tried playing hardball with the government, stating only that it was in the company's interest to come up with a good deal for Canada.

The ministers also deflected questions over whether buying Super Hornets now would give the plane a leg-up on its competitors in the upcoming competition.

"We're having an open, transparent, competitive process," Foote said. "The more we have engaging in that process, the more competitors we have, the better it will be for Canada."

Air force officials were reportedly dead-set against the plan to purchase Super Hornets, which they consider outdated technology compared with the state-of-the-art — albeit largely unproven — F-35.

The government has also been accused of manufacturing a "capability gap" to allow for the purchase of the aircraft without a competition.

But the Liberal plan was praised by defence chief Gen. Jonathan Vance, who stated categorically that the military desperately needed new planes immediately.

"With this investment in the Royal Canadian Air Force over the short and long term, Canadian air space will be better defended," he said.

Opposition parties seized on the announcement as a waste of taxpayer dollars at best, and a case of political interference at worst.

"The prime minister is making a political decision about what fighter jets to buy our pilots," interim Conservative leader Rona Ambrose said during question period.

"Instead of telling our fighter pilots what jets they are allowed to have, why does he not let them make the decision?"

Prime Minister Justin Trudeau blamed the Conservatives for "completely botching" the procurement effort.

NDP defence critic Randall Garrison openly mocked the notion of an open competition with 18 new Super Hornets stationed at Canadian bases.

"I don't think anyone can take seriously that after we replace a third of our fleet with the Super Hornets there can possibly be a level playing field for some kind of open competition after that."

Rival Lockheed Martin, which makes the F-35, said it was "disappointed" by the news, but struck a conciliatory tone by saying it was looking forward to an open competition.

The government made a point of saying it would remain a member of the program that produced the F-35, and that the aircraft would be allowed to compete.

Manitoba Premier Brian Pallister expressed concern about the fate of Manitoba companies that have been supplying parts for the F-35.

"I take this as a very obvious departure from the stated commitments the federal government has made in respect to our aerospace industry here in Manitoba," Pallister said.

"We are not impressed or happy with the announcement this morning," he added.

— With files from Steve Lambert in Winnipeg

Lee Berthiaume , The Canadian Press

Ivison: Super Hornet Interim Buy a Political Decision

By: John Ivison, The National Post

In choosing to buy 18 Boeing Super Hornet fighters, the federal government has brought forward a political solution to solve a political problem of its own making, John Ivison writes.

The Liberals had campaigned on a promise that they would not purchase Lockheed Martin’s F-35 fighter jet to replace its aging and dwindling fleet of CF18s, which now numbers 77.

It would instead launch an open and transparent competition for a new fighter.

A former Defence official said a competition could produce an answer within a year. But that would carry the risk that the F-35 could win before the next election.

The commander of the air force has previously said he needs just 65 fighters to fulfil Canada’s NATO and Norad requirements.

But the government says it needs 18 new fighters and that any future competition would exclude “firststrike stealth capabilities.”

The solution: sole-source the interim Super Hornets purchase and delay the competition to replace the CF18 fleet for five years. The uncomfortable attempting to justify the indefensible. That was how it looked as government ministers Harjit Sajjan, Judy Foote and Navdeep Bains delivered the news that Ottawa will sole source the interim purchase of 18 Boeing Super Hornet fighter jets. They appeared to be secretly ashamed at the trumpery of it all, as well they should have been.

The Liberal government had a political problem: it campaigned on the promise that it would not purchase Lockheed Martin’s F-35 fighter jet, and that it would “immediately” launch an open and transparent competition to replace the aging CF18 fighter fleet.

But it could not risk being too open, transparent or immediate, lest the F-35 win before the next election.

So political operatives in the Prime Minister’s Office came up with a plan so cunning, you could put a tail on it and call it a fox: buy a small number of the F-35’s competitor and push off the competition to replace the fleet for five years.

Sajjan, the defence minister, decried the mismanagement of the previous Conservative government — “a highly politicized process” — that has left just 77 CF-18s in the fleet and no replacement jets on order. In this, he’s right but it hardly excuses instigating a repeat of history as farce.

By sole sourcing the interim purchase, the Liberals will be doing exactly what the Conservatives did when they chose the F-35 in the first place.

Sajjan waved away such suggestions. Canada has a “capability gap,” he argued, and is unable to meet its Norad and NATO commitments.

He presented the new plan as a political solution to a national security problem.

The reality, of course, is that the Liberals have brought forward a political solution to solve a political problem of their own making.

The commander of the air force, Lt.-Gen Mike Hood, who was noticeable by his absence, previously told Parliament he needs just 65 aircraft to fulfil Canada’s commitments, so the capability gap argument is unconvincing.

Chief of the Defence Staff, Jonathan Vance, was present at Tuesday’s press conference and said the Air Force cannot meet its current missions and have the ability to respond to unforeseen circumstances. But really, what else was he going to say? This is a political decision and Vance is obliged to suck it up or resign.)

Hood told a parliamentary committee last spring that he was confident the Air Force could cope, if a decision on a replacement fleet was taken “in the next five years.”

That was why Foote, the procurement minister, said the government will undertake a lengthy competition “to avoid the mistakes of the past; we will not cut corners.”

Does that mean her department is cutting corners with the new warships that just went out to tender? A winner for the Canadian Surface Combatant program will be chosen by 2017.

Ottawa has already held two rounds of consultations with industry on the fighters. How much more is there to learn? Alan Williams, former assistant deputy minister of matériel at the Department of National Defence, has said a competition could produce results within a year.

But that would mean a winner could be chosen before the next election — an unacceptable political outcome for the Liberals.

Hence the curious solution of Canada now “exploring” the acquisition of 18 new Super Hornets with Boeing.

“Before proceeding, the government reserves the right to decide if they can provide the interim fleet at a cost, time, level of capability and economic value that is acceptable to Canada,” said the official news release.

But surely that decision has already been taken. If there were any doubts about Boeing’s ability to deliver or about the price, why make the announcement?

Foote said the Super Hornet was chosen because it is “not in development,” a veiled reference to the F-35, even though the U.S. air force declared its first squadron of F-35A fighters combat ready in August.

What is clear is that the interim purchase will reduce the amount available to buy a replacement fleet. The government had previously earmarked $9 billion for 65 new jets. Foote could not say what the interim purchase would cost and Sajjan would not say how many jets the Air Force might still need, after the interim purchase of 18 new planes.

But we do know Kuwait bought 40 full-loaded Super Hornets, with support, equipment and training, for US$10.1 billion this week.

We also know that the 18 jets will be more expensive than they might have been, had the downward pressure on costs of a competition not been removed.

By sole sourcing from Boeing, the government may well have skewed the outcome of any future competition. The purchase of new Super Hornets will mean the RCAF will be operating a mixed fleet. The two jets share common weapons systems but have different engines, radar and electronics. Is the government willing to complicate things further, with the attendant cost implications, of adding a third jet to the mix?

Foote said, “Anyone who meets the criteria and wants to compete will be able to compete.” Yet the Liberal platform was clear that the CF-18 replacement competition “will exclude requirements that do not reflect Canada’s interests such as first strike stealth capabilities” — for which read the F-35.

Yet what is apparent to anyone with eyes is that Canada’s interests have been supplanted by the Liberal Party of Canada’s interests.

We may never know which aircraft best suits Canada’s needs. But we can be in no doubt about which best favours Liberal fortunes.

Tuesday, November 22, 2016

Government to Buy 18 F/A-18 Super Hornets as Stop Gap before Competition

By: Daniel Maillet, CAF Dispatch Author

This afternoon the Government of Canada announced that it will pursue the purchase of 18 Boeing F/A-18 Super Hornets as a "stop-gap" measure on the CF-18 Replacement Procurement file which has been laden with issues for years.

Image result for F/A-18

During the 2015 Election, the Liberals promised to quickly launch a competition to replace the ageing fleet of the RCAF CF-18 Hornets. Originally purchased in the 1980s, the RCAF intended to fly the CF-18 for 20 years, and replace the fleet in the early 2000s. Many of the 77 serviceable CF-18s are older than 35 years and are flying much longer than the manufacturer intended.

Therefore, according to Minister of Defence Sajjan and General Vance a capability gap has arisen. Sajjan said that Canada has commitments to NATO and NORAD to have a specific number of serviceable aircraft on any given day, and when combined the RCAF is not currently able to meet these requirements.

To address this capability gap, the Government intends to enter into negotiations with Boeing on the F/A-18, and will purchase the aircraft as long as the purchase is cost and benefit effective to Canada. Yet the Government has no plan should these benefits not benefit Canada. Sajjan indicated that due to national security; he could not provide numbers of required jets, or if Canada had declined missions due to the gap. General Vance indicated that yes some missions were declined but did not go into details; while reiterating the importance of the RCAFs role in deterrence in the defence of Canada.

Sajjan and Minister of Procurement Canada Foote both blamed the previous Government for the delay on the CF-18 replacement. Both indicated that the replacement of the CF-18 should be months away if the Conservatives had actually closed the file.

Sajjan and Foote diverted away from any discussions of sole-sourcing the interim purchase.

The Government will open an open and transparent competition for a permanent fleet at some point in 2017 - a process that will take a minimum fo 5 years. A term that seems extremely long, especially as the file has been partially open for nearly a decade.  Sajjan announced that the Canada will remain part of the JSF-Consortium, and Foote did not say that Lockheed Martin would be excluded  - so therefore, the JSF F-35 will be allowed to bid.

The government believes that once the 5-year competition is complete, the delivery of the new fleet of fighter aircraft will be by late 2020. Therefore the current CF-18s will undergo further life-extension plans to keep flying until at least 2030. Canada is entering into the unknown with the CF-18 lifespan; no other country will have flown the "legacy" model of the F-18 this long.

Foote defended the length of the competition, by saying the Government does not want any mistakes. Foote confirmed that the Government is working with the American government on this file - almost indicating that the F/A-18 or the F-35 will be selected during the 5 years competition.

When asked why the F/A-18 was selected as the interim option Foote and Sajjan both indicated that the RCAF could not select an aircraft in development, and therefore the F/A-18 was the best option. When asked about the numerous European models that are in-service; they reiterated the interoperability with the American forces. Further, strengthening what many believe will be a 2 horse race - the F/A-18 or the F-35.

The announcement today indicated that investments will be made into the "legacy" CF-18s to ensure that they can safely operate for the RCAF and the safety of Canada and global security.

Foote indicated that the Government does not believe that the purchase of the F/A-18 Super Hornet will not stack the deck in favour of Boeing anymore than it does Lockheed Martin by remaining in the JSF-Consortium.

The government has not made any plans on what to do with the "interim" aircraft once a permanent fleet is selected. Any decisions on the disposal of the interim fleet will only be made in the future according to General Vance.

This announcement will invest billions of dollars into the interim fleet, as well as billions into a future permanent fleet. So where the savings will come for the future of the Royal Canadian Navy will be made is anyone's guess.

New fighter jets could cost more than Liberals Projected

By: DANIEL LEBLANC AND STEVEN CHASE, The Globe and Mail 

The Liberal Party promised massive savings on the purchase of new fighter jets in the last election, but the recent purchase of Boeing F/A-18 Super Hornets by Kuwait suggests bargains will be hard to find.

The federal government is nearing a decision on the replacement of its fleet of CF-18s, facing pressure to deliver a better deal than the previous, Conservative government had put together.

While straight comparisons are never easy in military procurement, Kuwait’s recent purchase of 40 Super Hornets for $13.5-billion raises questions about Canada’s ability to meet its own financial targets for new fighter jets.

During the 2015 election campaign, the Liberals said they could acquire their own fleet of Super Hornets for $65-million per unit. (Boeing)
During the 2015 election campaign, the Liberals said they could acquire their own fleet of Super Hornets for $65-million per unit - a figure far less than then $335-million Kuwait just agreed to pay. 

Related
Read more: Breaking down the dogfight for Canada’s next fighter jet
Read more: U.S. pitches F-35 jet to Ottawa as Liberals aim to replace fleet

The deal means Kuwait will be paying an average of $335-million per aircraft, a price that includes training, spare parts and engines, weaponry and logistical support.

During the 2015 election campaign, the Liberals said they could acquire their own fleet of Super Hornets at a flyaway price (which does not include training or spare parts) of $65-million per unit; by way of comparison, the Liberals said the Lockheed Martin F-35, which had been favoured by the Conservatives, had a flyaway price of $175-million per aircraft.

Military analyst David Perry said the Kuwaiti deal suggests the Liberals were overly optimistic before they came to power.

“This cements my skepticism about the assumption that some fighter options are horrendously expensive and others are dirt cheap,” said the senior analyst at the Canadian Global Affairs Institute.

The previous government had set aside an envelope of $9-billion to acquire a fleet of 65 fighter jets.

Mr. Perry said it is impossible to determine how much Canada would pay for a fleet of Super Hornets or F-35s today, but the numbers out of Kuwait show “all of these aircraft are expensive.

“Some of them may be relatively more or less costly, but there is no such thing as cheap fighter aircraft.”

The federal government is promising a decision on the final process to replace its CF-18s by the end of the year. The matter will go to cabinet shortly.

“We have a lot of credible information and analysis that were done over the summertime and we’re putting the final touches onto that,” Defence Minister Harjit Sajjan said in an interview.

“At the end of the day, I want to make sure that our men and women have the right type of aircraft and that we have the right benefits as a nation, because we’re making a very big decision here and I want to make sure we get this right,” the minister added.

During the campaign, the Liberals said they would change the requirements for the new fighter jets to place less emphasis on “first-strike stealth capabilities” and greater emphasis on the ability to contribute to the “defence of North America.”

“We will reduce the financial procurement envelope for replacing the CF-18s. Instead of budgeting for the acquisition of 65 F-35s, we will plan to purchase an equal or greater number of lower-priced, but equally effective, replacement aircraft,” they said.

Still, they promised to launch an “open and transparent competition” for new fighter jets, which officials at both Lockheed Martin and Boeing continue to advocate.

Sources said there are three options before the cabinet: launching a competition, buying a new fleet through a sole-source process or acquiring a few aircraft to form an “interim fleet” and finalizing the fleet at a later date.

The Department of National Defence predicts that its fleet of CF-18s will be able to fly into the next decade, with some aircraft due to be retired in 2023; but the Canadian Armed Forces will need a new fleet of fighter jets by 2025.

Cabinet could decide fighter jet plan as early as Today

By: Lee Berthiaume, The Canadian Press

Image result for F/A-18 V F-35
An RAAF F/A-18 Super Hornet. Australia recently purchased the Super Hornet as a stop-gap measure until their new F-35s are delivered. 
OTTAWA — Industry sources expect the Liberal government to decide as early as Tuesday whether to purchase a new fighter jet without a competition.

Federal cabinet ministers are reportedly considering three options for replacing Canada's CF-18s, one of which they are expected to pick during their weekly closed-door meeting on Parliament Hill.

The options include holding a competition, buying a new warplane without a competition, or purchasing an "interim" aircraft as a stop-gap measure until a future competition.

The government was eyeing the third option in the spring, with the intention of buying Boeing Super Hornets, until an outcry from industry and the opposition forced them back to the drawing board.

But while Defence Minister Harjit Sajjan held consultations with different industry players in the summer, industry sources say the interim option is back as the preferred choice.

Sajjan's office refused to comment on Monday, with a spokeswoman saying only that a decision still has not been made.

In the House of Commons, Conservative defence critic James Bezan called for an open competition to replace Canada's CF-18s.

Purchasing Super Hornets without a competition would "be foolishly putting billions of taxpayer money at risk," he said.

Sajjan would only say that the government had done "a considerable amount of work" on the file.

"We will make a decision on replacing the fighters and will pick a process that will meet the needs of Canada."

Anything short of an open competition, which the Liberals promised during last year's election, is sure to stoke anger from industry players as well as the opposition.

Part of the problem for the Liberals is that while they promised an open competition, they also promised not to buy the F-35 stealth fighter.

But the government has been struggling with how to fulfil that promise for fear any attempt to exclude the stealth fighter from a competition would result in a multibillion-dollar lawsuit.

Prime Minister Justin Trudeau nonetheless made his views of the F-35 known in June, when he panned the stealth fighter as a plane that "does not work and is far from working."

Recent memos and reports within the U.S. military appear to back up that assessment, with the Pentagon's top weapons tester warned last month that the aircraft was being rushed too fast through testing.

There is precedent for buying Super Hornets on an interim basis. Australia paid $2.5 billion for 24 of the aircraft to replace antiquated F-111 jets until newer F-35s were ready.

However, the idea of Canada needing to follow suit was largely dismissed by a government-appointed expert panel and the military's research branch as too expensive, since the air force would be operating two types of aircraft, demanding different training, infrastructure and supporting equipment.

Rival companies have argued that purchasing Super Hornets on an "interim" basis would stack the deck in its favour in any future competition.

There are also concerns that Canada would fall behind the rest of its allies — as well as potential foes Russia and China — by purchasing the older Super Hornet rather than the state-of-the-art F-35.

The Liberals have emphasized the need for speed since Sajjan warned in the spring that Canada did not have enough CF-18s to meet its commitments to NATO and North American defence.

Critics, however, accused the Liberals of manufacturing a crisis to justify buying a new fighter jet other than the F-35 stealth fighter without a competition.

— Follow @leeberthiaume on Twitter

Lee Berthiaume, The Canadian Press

Saturday, November 19, 2016

Government Again Considering Sole-Source Super Hornet Buy

By: David Pugliese, National Post 

A Liberal government proposal to buy Super Hornet fighter jets as a replacement for the air force’s aging CF-18s is back on the table.

But whether it will move ahead is still unclear.
A U.S. Navy F/A 18 Super Hornet performs at the Canadian International Air Show at the CNE in Toronto, Sept. 4, 2016.
A U.S. Navy F/A 18 Super Hornet performs at the Canadian International Air Show at the CNE in Toronto, Sept. 4, 2016.
In June the government proposed the purchase of Boeing Super Hornets as an interim measure, but that option disappeared as it faced intense criticism from the aerospace industry and opposition MPs.

Aerospace industry officials say they believed the Liberals were moving towards an open competition for a fighter replacement. But the option to buy the Super Hornets on a sole source basis and forgo a competition until around 2030 has again resurfaced, industry sources now say.

Prime Minister Justin Trudeau’s office, with advice from Defence Minister Harjit Sajjan, has been pushing the option, despite opposition from some leaders in the Royal Canadian Air Force, sources add.

Jordan Owens, a spokeswoman for Sajjan, said Thursday that no decision has been taken yet on replacing the CF-18s.

Sajjan has repeatedly stated there is a need to immediately replace the CF-18s but his comments have been undercut by air force officers who point out the aircraft can keep flying until at least 2025.

Related
Boeing , Lockheed pull out all the stops to woo Canadian defence officials looking to replace CF-18s
A cautionary tale for Canada? Boeing preps legal challenge after Denmark rejects Super Hornet for F-35
John Ivison: By sole-sourcing Super Hornets, Liberals now look identical to Tories on fighter-jets file

The acquisition of an interim fleet of 20 Super Hornets would push off the need to acquire a new fleet of fighter jets for more than a decade.

Such a deal, if it proceeds, would give breathing room to the Liberals. During last year’s election campaign, Trudeau promised Canada would not purchase the controversial F-35, an aircraft he said was unnecessary for the country’s needs and too expensive. Trudeau promised his government would hold a competition.

By moving ahead with a sole source purchase of Boeing Super Hornets – and promising a competition in the late 2020s — the Liberals will still be able to claim they kept their election promise, industry sources say.

In July, the government asked for initial information from fighter jet manufacturers so it could determine how to proceed with a replacement program. Five companies responded.

Boeing submitted information on its Super Hornet, Lockheed Martin provided information on the F-35A, Dassault responded with the data on the Rafale, Eurofighter with the Typhoon, and the Saab Group offered details on the Gripen aircraft.

The re-emergence of the proposal to sole source the Super Hornets appears to have caught industry off guard.

Marillyn Hewson, Lockheed Martin’s CEO, was in Ottawa Tuesday at an aerospace conference highlighting both the F-35 and Canada’s participation in the project. She pitched the aircraft as a way to bring more jobs to Canada.

“Since the beginning of the program in 2001, more than 110 Canadian companies have contributed to the development and production of the F-35, bringing advanced technology and engineering work to Canada,” Hewson told the audience. “Today, Canadian-built components are on every F-35 produced. Canadian industry has been awarded over $1 billion in industrial work to date, and I’m confident the F-35 will bring significant economic benefits for decades to come.”

In August, two U.S. Air Force F-35s travelled to Canada to highlight the capabilities of the aircraft. At the time, Lockheed Martin officials said it looked like a competition would be held and their aircraft would be invited to take part.

But Trudeau is not a fan of the F-35.

When the National Post first reported on the Liberals’ proposal in early June to proceed with a sole source deal for the Super Hornets, Trudeau responded to criticism in the Commons by slamming the F-35. He dismissed the F-35, claiming the jet “does not work and is far from working.”

But a short time later the U.S. Air Force declared the jet as ready for combat.

Conservative defence critic James Bezan said in an email Thursday that “the Liberals have completely politicized this purchase by promising in the election they would exclude the F-35.

“Justin Trudeau and his friends are not fighter jet experts. Only an open and fair competition will clear-up the political mess they’ve created,” Bezan wrote.

Sajjan has said a decision on how the government will proceed on replacing the CF-18s will be made shortly, suggesting it could come by the end of the year.

The F-35 became a major political headache several years ago for the Conservative government. Although a Liberal government originally signed on to a research and development program for the plane, the Conservatives significantly expanded the commitment and later agreed to buy 65 of the planes.

The program was dogged by controversy and the aircraft faced numerous technical problems.

Aerospace industry officials say the declaration that the F-35A is ready for combat is good news for the aircraft program. But others point out that more development of the plane is needed.

Tuesday, November 15, 2016

Canada Expected to Launch new Fighter Competition

By: David Pugliese, National Post 

Canadian firms have now won $1 billion worth of work on the F-35 fighter jet, a selling point that aircraft manufacturer Lockheed Martin hopes to use as it prepares for an expected competition to replace the CF-18 fleet.

Cabinet officials met recently to discuss the way forward on a CF-18 fighter replacement and industry sources say they now expect the Liberal government to eventually proceed to a competition to buy new aircraft.

Aerospace firms are shifting into high gear for that event, although the timing of an announcement is unknown.

Marillyn Hewson, Lockheed Martin’s CEO, will be in Ottawa Tuesday for a major aerospace conference and various meetings, while Pratt and Whitney officials will be highlighting details about the F-35 engine the firm builds.

Shelley Lavender, the president of Boeing Military Aircraft, will be in Ottawa on Thursday for the same conference. Lavender was program manager for Boeing’s Super Hornet aircraft, one of the F-35’s rivals in any Canadian competition.


Jordan Owens, spokeswoman for Defence Minister Harjit Sajjan, said Monday that work is still underway on determining how to replace the CF-18. Sajjan has said the procurement strategy would be decided in months, not years, as the CF-18s need to be replaced quickly.

The minister has noted he prefers an open competition.
Jack Boland/Postmedia NetworkA U.S. Navy F/A 18 Super Hornet performs at the Canadian International Air Show at the CNE in Toronto, Sept. 4, 2016.
Prime Minister Justin Trudeau came to power pledging the Liberals would hold a competition for a new fighter jet but, at the same time, said it would not buy the F-35. Trudeau has yet to explain that contradiction.

Lockheed Martin said Monday that while in Canada, Hewson will meet with company employees and “numerous Canadian stakeholders to Lockheed Martin.”

Jack Crisler, one of Lockheed Martin’s senior F-35 officials, told Postmedia in August that it looked like the F-35 would be included in any competition.

The stealth fighter became a political nightmare for the Conservative government after it pledged to buy 65 of the planes. The F-35 was plagued with technology problems. U.S. lawmakers were complaining about its cost.

Last year Donald Trump, then one of a number of Republican presidential candidates, complained about the cost of the F-35 and the technology issues affecting the aircraft. “I do hear that it’s not very good,” he said during an October 2015 radio interview. “I’m hearing that our existing planes are better.”

But Trump, now president-elect, has not indicated what, if anything, he will do about the F-35 program.

Related

Canadian military to ask Ottawa to approve up to $500 million in spending for CF-18 upgrades
A cautionary tale for Canada? Boeing preps legal challenge after Denmark rejects Super Hornet for F-35
F-35 exit strategy: Canada could pay about $313M to pull out of jet program, defence documents show

However, stock market analysts are seeing positive news for defence company stocks, including Lockheed Martin, because of Trump’s election, as he has promised to revamp the U.S. military.

Lockheed Martin officials are keen for a competition since they believe their aircraft can readily beat other planes. The F-35 won in competitions in Denmark, Japan and South Korea, they add.

In June, Lockheed Martin almost saw its hopes of selling planes to Canada disappear completely. The government was close to moving on an interim purchase of Super Hornet jets from Boeing and Trudeau claimed the F-35 “does not work and is far from working.”

That prompted Lockheed Martin to warn that Canadian companies who had contracts on the F-35 would suffer. After that, plans for a Super Hornet interim deal seemed to disappear.

The F-35 has been declared ready for combat by the U.S. Air Force although critics have pointed out that much work still needs to be done on the aircraft. Two F-35s visited Canada for the first time at the August airshow in Abbotsford, B.C.

Monday, October 3, 2016

Counter Argument to Vimy Paper #33: The F-35 and the CF-18 Replacement Debacle

On September 15th, 2016 - I published the Executive Summary of the CDA Institutes latest Vimy paper by Mr. Skimooka and the F-35 and the Canadian Procurement Process. I said then that it was heavily biased towards the F-35. Alan Williams has since published a counter argument and challenged Shimooka's essay.

The CDA Institute decline to publish the report.

It was published yesterday by Defence Watch. 

By Alan Williams

Defence Watch Guest Writer

In Mr. Shimooka’s Vimy Paper, “The Fourth Dimension: The F-35 Program, Defence Procurement, and the Conservative Government, 2006-2015”, he purports to present a history of the events surrounding the F-35 debacle. Unfortunately, in my view it is a flawed study reflecting Mr. Shimooka’s failure to grasp some of the basic principles of defence procurement and his acceptance of Lockheed Martin’s version of costs.

Below are just a few examples:

PROCESS AND ACCOUNTABILITY

Example 1

On page 12, Mr. Shimooka writes that there were several unique challenges for the Canadian government.

“The first involved how to properly manage an acquisition process given the unusual nature of the JSF Partnership. With its cooperative development approach, the F-35 did not conform to any other program within the bureaucracy’s experience. The government would need to guarantee two objectives simultaneously: managing a selection process that would ensure that Canada obtained the best possible replacement for the CF-18 (in terms of capability and cost), while cultivating the potential for tens of billions of dollars in opportunities for Canadian industry within the JSF program if the F-35 was selected as a replacement.”

Frankly, participating in the JSF program while simultaneously pursuing an open, fair and transparent competitive process presents no problem at all. As long as Canada remained a partner in the JSF program its industries were entitled to pursue and hopefully win significant contracts. Should Canada choose an aircraft other than the F-35, it would forego its opportunity to bid on contracts within the JSF program. Best estimates were that Canadian industry might garner up to $10-$12 billion in contracts. After all, nothing was guaranteed. However, any successful bidder would be required to guarantee industrial opportunities equal to or greater than the value of the contract, at least twice as great as under the JSF program. Furthermore, the Department of Innovation, Science and Economic Development is in the position of ensuring that these jobs are high value jobs.

Example 2

On page 12, Mr. Shimooka identifies the selection process as the second major challenge for the government. Specifically,

“How to establish criteria for selecting a replacement, when one option is clearly more capable and will be used by most of Canada’s major allies?”

This too is a non-issue. First, the criteria or statement of requirements (SOR) needs to be based on the roles for the jet as articulated by the federal government. What is required is not necessarily the jet that has the most capabilities but the one that has the proven, operational capabilities that meet Canada’s needs. Note, I refer to proven, operational capabilities, not theoretical capabilities described on paper but not yet operationally approved.

Second, whether or not a jet is used by most of our allies is irrelevant. We should buy the jet that meets our needs not those of other countries. As for the issue of interoperability, we have and will continue to operate in theatres of operation with allies who bring a wide-range of aircraft to the fight. To this end, we regularly conduct military exercises or “war games” with our allies simulating operational situations and ensuring that notwithstanding the differing assets, we can communicate and work effectively together.

Example 3

On page 13, Mr. Shimooka writes,

“The 2006 assessment was fairly clear, suggesting the F-35 was likely the most capable and lowest cost option – and one that offered major industrial benefits for Canadian firms. The government accepted the recommendations, and on its basis signed the MOU in December of that year.”

The 2006 assessment was indeed pivotal, not in that it was used as the basis for signing the Phase III MOU. Rather, that it was used to support a recommendation made on Sept. 19, 2006 to the Minister of National Defence by the ADM (MAT) to purchase the F-35 – a crucial milestone that Mr. Shimooka omits.

There were two fundamental problems with this recommendation. First, in 2006 the F-35 was in its embryonic stages of development with its capabilities and its costs still unknown. To make such a recommendation at that time was indefensible. Second, in making such a recommendation, the ADM (MAT) abdicated his role and accountability as the individual responsible for acquisition within DND. Acquisition decisions are placed in the hands of civilian, rather than military, authorities to ensure objectivity and rigour before making recommendations up the line to ministers. In this case, the ADM (MAT) merely accepted the air force’s superficial analysis and ignored his duties.

This unsupportable recommendation launched the long downward spiral into what I refer to as the

F-35 debacle. Once accepted, neither the bureaucrats nor government leaders would back off the recommendation no matter what facts were available to them.

Example 4

Mr. Shimooka goes to great lengths to applaud the internal work at DND. On page four, he states:

“Nevertheless officials within DND, and later the National Fighter Procurement Secretariat worked to overcome these challenges, exercising due diligence with a rigorous evaluation process. The work of both included numerous safeguards to ensure the integrity of the entire approach. Although the effort was not flawless, the assessments made by these bodies were accurate and validated in subsequent years.”

Furthermore in his executive summary he writes,

“The federal bureaucracy, initially led by the Department of National Defence worked to undertake a proper evaluation of the CF-18 replacement program. Far from being exorbitantly expensive or technologically defective, it discovered the F-35 was the best option for Canada and recommended a sole source selection in 2010.” and that this study “is a story not of bureaucratic mismanagement or military bias.”

The reality is that no amount of internal analysis can substitute for an open, fair and transparent competition. First, internal analysis does not include the highly sensitive, secret operational information only provided through a competitive framework. Second, price and industrial benefits are factors in determining a successful bid and these can only be optimized and realized through a competition.

Furthermore, there is a vast difference between believing, rightly or wrongly, that “the F-35 is the best option for Canada” and recommending “a sole-source selection”. The former is an opinion. The latter is a procurement strategy that must comply with applicable legislation. Under section 506.12 (b) of the Agreement on Internal Trade, a sole-source option can be pursued if there is “an absence of competition”. In this case, it does not comply. There is no legal justification for a sole-source award.

If the F-35 did not exist, would we say that no other aircraft exists to meet our needs? Would we therefore not purchase any fighter aircraft replacement? Of course not! There can be no doubt that there are a number of alternatives to the F-35. These include Boeing’s Super Hornet, Dassault’s Rafale, Saab’s Gripen and EADS/BAE’s Eurofighter Typhoon. These are used by many of our allies and each, to a greater or lesser extent, can meet Canada’s fighter replacement needs. Which one can best meet Canada’s needs taking into consideration price and industrial and technical benefits can only be determined through a competition. Of course, if you have predetermined which aircraft you want, then you wire or fix the requirements to suit your needs. That is what occurred.

Contrary to Mr. Shimooka’s assertion, this indeed is a story of bureaucratic mismanagement and military bias.

COSTS

Example 5

On page 11, Mr. Shimooka writes that after a major replan of the JSF program, a target was established that “would see the aircraft cost approximately $75 million dollars a copy.” Frankly, the $75 million figure never was the price any purchaser would ever pay to purchase an F-35. Rather, it reflects one of the many costs that went into building the F-35. It is a tribute to Lockheed Martin’s ingenious marketing strategy that the public was led to believe that Canada would pay $75 million per aircraft. Sadly, our government and officials bought into this strategy and apparently so has Mr. Shimooka.

An analogy may help to explain Lockheed Martin’s deceptive cost communications strategy. How would you react if you were to enter a furniture store, ask a salesperson about the price for a chair and be told that direct labour cost was $75? You would likely be pretty upset. You would recognize that the $75 cost figure may or may not be correct but is not the price you would pay. The final price would be composed of direct labour, direct material, overhead and profit. You would feel that the salesperson is trying to deceive you.

As the attached U.S. Cost Definitions chart indicates, the $75 million referred to by Mr. Shimooka only represents the “recurring flyaway cost“ of the F-35. The final price that Canada will pay to purchase the aircraft will be composed of the recurring flyaway cost, the non-recurring flyaway cost, the weapon systems cost and the procurement cost.



By the way, according to the Selected Acquisition Report FY2017 referred to by Mr. Shimooka, if a buyer were to purchase the F-35A in 2016, the “recurring flyaway cost” for the jet would be $99.6 million. In 2012, these costs would have been $91.6 million.

THE OFFICE OF THE PARLIAMENTARY BUDGET OFFICE (PBO) REPORT/

AUDITOR GENERAL (AG) REPORT

I am sure that officials in the PBO and AG can adequately defend their reports. However, it is important to note that neither of these reports would likely have been demanded were it not for the government’s misleading cost information. Anyone involved with defence procurement had to know that the government’s initial claim that it would cost $9 billion to acquire 65 jets and $7 billion to support them was ludicrous. The long-term support costs are typically 2-3 times as great as the initial acquisition cost. In this case the government was claiming the support costs were less than the acquisition costs!

CONCLUSION

Much as Mr. Shimooka may try to construct another narrative, the Conservative government’s decision to sole-source the F-35A, was a disaster of its own making. Resorting to a campaign of misinformation and a strategy to understate the costs of the program, the government lost all credibility.

At the outset, it launched a misinformation campaign, justifying its decision with statements it had to know were false. These included:

-Claiming the F-35 was the best plane at the best price;

-Claiming the F-35 was the result of a Canadian competition;

-Claiming the F-35 was needed for interoperability;

-Claiming the F-35 was needed for industrial benefits.

Later on, when it was forced to pause as a result of the PBO and AG reports, the government again resorted to subterfuge, developing a seven-point plan that was nothing more than a stalling strategy.

Finally, as its last attempt to foist the F-35A upon an unwitting Canadian taxpayer, the government attempted to undertake a clandestine deal with the U.S. Air Force. Not surprisingly, this duplicitous behavior was discovered and the government had to back off.

Understating of Costs

Parliament and the public simply wanted to know how much this program was going to cost. Instead of providing a full and fair response, the government continuously understated the costs, thereby inviting the intervention of the PBO and AG. The PBO and AG reports further damaged the credibility of the government by reinforcing the extent of the government’s deceit. From an initial government estimate of $16 billion, current estimates are that the program will cost Canadians over $40 billion.

The irony, of course, is that the F-35A may yet be the best aircraft to meet Canada’s needs. The only way of knowing for certain is through an open, fair and transparent competition, a competition based upon the government’s public articulation of the role it sees for our military and the role it sees for Canada’s fighter replacement. Acquiring aircraft through a sole-source contract is not only illegal but bad business. Costs are higher and industrial benefits are lower. Most importantly, only through a competition can we be certain that we have purchased the best plane to meet the needs of our men and women in the military.

In his conclusion, Mr. Shimooka contends that:

“Canadian political parties and the public have largely failed to grasp the underlying facts, and created a discourse that bore little resemblance to reality.”

Fortunately, the exact opposite was true. That’s why the Conservative government failed to achieve its objective.

----
Alan Williams is a former ADM (MAT) at DND. He is now President of The Williams Group, providing companies with procurement expertise. In 2002 he signed the Memorandum of Understanding committing Canada to the second phase of the Joint Strike Fighter program. Mr. Williams is the author of two books, “Reinventing Canadian Defence Procurement: A View From the Inside” published in 2006 and “Canada, Democracy and the F-35” published in 2012. He can be reached at williamsgroup691@gmail.com.

Tuesday, September 20, 2016

Liberals accused of hijacking report recommending CF-18 Replacement and BMD Debate

Lee Berthiaume, The Canadian Press

OTTAWA — Opposition parties have accused the Liberals of hijacking a committee report that recommended buying new fighter jets within a year and re-opening the debate over ballistic missile defence.

The House of Commons defence committee on Monday released the results of a two-month study into the defence of Canada and North America that had been requested by Defence Minister Harjit Sajjan as part of the Liberal government's plan to publish a new defence policy.

Three of the 13 recommendations contained in the final report deal specifically with replacing the Royal Canadian Air Force's aging fleet of CF-18 fighter jets, including one calling on the government to decide on a replacement "within the next 12 months."

Another recommendation lays down a number of criteria for the new warplane, including compatibility with the air force's existing infrastructure and "well-defined" costs that won't shortchange other military projects.

The Liberals promised during last year's election not to buy the F-35 stealth fighter, and redirect any savings back into new warships for the navy.

The report also calls on the government to "reconsider Canada's position with regard to ballistic missile defence (BMD) in the context of Canada's defence priorities and limited financial resources."

But in dissenting opinions attached at the end, both Conservative and NDP committee members accused the Liberals of having written the report and recommendations without opposition input.

"No opposition members were present for the final stages of drafting," the Conservatives wrote.

"Some members of the committee, with the tyranny of the majority, rushed through the final stages of the draft report, which included making recommendations and established the short deadline for the dissenting opinions for opposition members."

Conservative committee members alleged the final report simply reflects the Liberal government's political agenda with regards to defence, a charge echoed by the NDP.

"The committee report marshals evidence to bolster the Liberal decision to sole-source the purchase of Super Hornets, their desire to reposition Canada's current fighter jets, and their attempt to justify participation in the U.S. missile defence program," the NDP wrote.

The Liberals have said they need to replace the CF-18s quickly to avoid a shortage of aircraft. Opposition parties, however, have accused the government of manufacturing a crisis to justify buying a fighter jet other than the F-35 without a competition.

The report released Monday is the second in as many years from the Commons' defence committee dealing with defending North America. The first, published in June 2015, received unanimous approval from all committee members.

- Follow @leeberthiaume on Twitter.

Thursday, September 15, 2016

Vimy Paper: The F-35 Program, Defence Procurement, and the CF-18 Replacement Debacle

The Conference of Defence Associates has published it's latest Vimy Paper. In it, Richard Shimooka outlines the troubled history of the RCAF's CF-18 replacement. Shimooka starts as early as 1997, but mainly focuses on the Harper Era in his paper, tracking the procurement of the CF-18 Replacement from 2006 to 2015. While Shimooka does not make a direct appeal to purchase the F-35 JSF; I believe there is a fair amount of bias in the article to indicate that he is calling for the government to learn from past procurement, and move forward with the purchase. 

Decide for yourself: 

"The Fourth Dimension: The F-35 Program, Defence Procurement, and the Conservative Government, 2006-2015"

 Executive Summary:

Since 1997, the Government of Canada has engaged in a process to replace its tactical fighter fleet of 122 CF-18 Hornets, which were acquired in the 1980s. Much of that history has been intertwined with a single aircraft: Lockheed Martin's F-35. The public discourse has largely been dominated by criticism of the selection process, as well as the aircraft's capabilities, cost, and attendant industrial benefits.

Inside of government, a very different view emerged. The federal bureaucracy, initially led by the Department of National Defence worked to undertake a proper evaluation of the CF-18 replacement program. Far from being exorbitantly expensive or technologically defective, it discovered the F-35 was the best option for Canada and recommended a sole source selection in 2010. Program troubles in the United States, two deeply flawed oversight reports by the Parliamentary Budget Officer and the Office of the Auditor General, as well as a series of errors by the government resulted in a loss of support for the project. Consequently, a new assessment process was launched in 2013, known as the Seven-Point Plan. However, it too endorsed the sole-source selection of the F-35, resulting in a series of culminating events leading up to the 2015 federal election.

This study is a history of these events. It is a story not of bureaucratic mismanagement or military bias, but one of civil-military relations and political dysfunction. The Liberal victory in the October 2015 election might have initiated a new phase of the CF-18 replacement program history. Yet the preceding several years should provide a number of lessons going forward. Few, if any, of the program's fundamentals have changed. Many of the considerations that underpinned the original analysis are still valid. The current government would do well to take heed of what occurred before.

To read the full Vimy Paper, see link below.

http://www.cdainstitute.ca/images/Vimy_Papers/Vimy_Paper_33.pdf

Thursday, August 25, 2016

F-35 exit strategy: Canada could pay about $313M to pull out of jet program


By: David Pugliese, The Ottawa Citizen

Canada could withdraw from the F-35 stealth fighter jet program on short notice by paying a little more than $300 million U.S., according to an analysis prepared by the defence department soon after the Liberals won the federal election.


The government could leave after only 90 days’ notice, although it would still need to pay the remaining fees the previous Conservative government committed to the F-35 program, according to the Department of National Defence documents obtained by Postmedia.

The analysis was produced four days after the election.

Prime Minister Justin Trudeau came to power, pledging the Liberals would not buy the F-35, an aircraft he said was unnecessary for Canada’s needs and too expensive.

Although a Liberal government originally signed on to a research and development program for the plane, the Conservatives significantly expanded that commitment.

In 2006, Canada agreed to participate as a partner at a cost of US$551 million, according to the DND analysis. That did not commit the government to buying the aircraft, although it provided inside data about the project and a chance for domestic aerospace firms to bid on F-35 work.

“Canada has not signed a contract and can pull out by providing a 90-day written notification to other participating nations,” the analysis prepared for Deputy Minister John Forster pointed out.

“Canada’s liability would be no greater than US$346.7 million” – the difference between what it had already contributed and what was remaining of the original US$551 million commitment.

Since the analysis was produced, the Liberal government has paid another US$33 million.


The analysis noted Ottawa had also signed a separate memorandum of understanding with F-35 builder Lockheed Martin.

Under that commitment, Lockheed Martin provided F-35 work to Canadian firms on the understanding the Canadian government would eventually buy 65 of the jets.

If Canada decided not to proceed with the purchase, Lockheed Martin would not be obliged to employ domestic firms, the DND analysis noted.

“There is a risk that some contacts would not be renewed,” it added.

The Liberal government is expected to decide within months how to replace Canada’s aging fleet of CF-18 aircraft.

Defence Minister Harjit Sajjan has talked about a fair and open competition for a new fighter jet. Despite Trudeau’s pledge that Canada will not buy the F-35, Lockheed Martin, with other aircraft firms, recently submitted information about their planes to the government.

“It looks like we’re being included so we look forward to competing on that basis,” Jack Crisler, one of Lockheed Martin’s senior F35 officials, recently told Postmedia.

The stealth fighter became a political nightmare for the Conservative government after it agreed to buy the planes. The F-35 has been plagued with technology problems and U.S. lawmakers have complained about its cost.

In 2012, Auditor General Michael Ferguson issued a report that concluded Canadian defence officials withheld key information from Parliament about the proposed purchase, underestimated costs and did not follow proper procurement rules.

In June, Lockheed Martin almost saw its hopes of selling planes to Canada evaporate. Ottawa was close to moving on an interim purchase of Super Hornet jets from Boeing and Trudeau claimed the F-35 “does not work and is far from working.”

In response, Lockheed Martin warned Canadian companies who had F-35 contracts would suffer. After that, plans for a Super Hornet interim deal seemed to disappear.

The U.S. Air Force says the F-35 is combat ready although critics say much work still needs to be done on the aircraft. Two F-35s recently visited Canada for the first time at the airshow in Abbotsford, B.C.

© Copyright (c) National Post

Friday, August 19, 2016

F/A-18 & F-35 Come Face to Face in Canada


By: David Pugliese, The Ottawa Citizen

Last weekend the unicorn finally came to Canada.

Sitting on the tarmac at the Abbotsford Air Show, the F-35 stealth fighter made its first appearance in this country. Recently declared combat-ready by the U.S. Air Force — though critics point out much more work needs to be done on the jet — officials with its manufacturer, Lockheed Martin, were jokingly referring to it by the name of the mythical beast, because it’s been talked about here so much and seen not at all.

An F-35A fighter aircraft during a flypast at the Abbotsford International Airshow on Aug. 11. “It’s hard to find bad news” about the plane, said pilot Lt.-Col. Curtis Pitts. “It’s all good news.” Both Lockheed and Boeing are promoting their longtime presence in Canada as part of their pitch. DARRYL DYCK / THE CANADIAN PRESS
But the plane’s appearance in Abbotsford marked the first major shot in the next phase of the high-stakes marketing battle to sell a new fighter to the Canadian Forces.

And the two main contenders in that battle — Boeing with its Super Hornet and Lockheed with the F-35 — came face-to-face in Abbotsford.

“There’s no better vehicle to educate the public than to allow them to see the actual aircraft,” said Jack Crisler, one of Lockheed Martin’s top F-35 officials. “It’s here. It’s real.”

The Liberal government is expected to decide within months how it wants to proceed on replacing Canada’s aging fleet of CF-18 fighters.

Justin Trudeau came to power last fall pledging that a Liberal government wouldn’t buy the F-35, an aircraft he said was too expensive and unnecessary given Canada’s needs.

That should have been the kiss of death for Lockheed Martin. But Crisler said he’s feeling good these days about how Canada is moving ahead on the fighter jet file. Defence Minister Harjit Sajjan has talked about holding a fair and open competition. Lockheed Martin, along with other aircraft firms, recently submitted information to the government about their planes, and met Monday with federal officials.

“It looks like we’re being included, so we look forward to competing on that basis,” Crisler said.

“I’m certainly more optimistic than I was in December 2015.”

The controversial stealth fighter became a political nightmare for the Harper government after it pledged to buy 65 of the planes, which were plagued by technology problems and complaints from U.S. lawmakers about their cost.

Auditor General Michael Ferguson found that Canadian defence officials withheld key information from parliament about the proposed purchase, underestimated the costs of the jets and didn’t follow proper procurement rules.

In June, Lockheed Martin almost saw its hopes of selling planes to Canada disappear completely. The Liberal government was close to moving on an interim purchase of Super Hornets and Trudeau claimed the F-35 “does not work and is far from working.”

That prompted Lockheed Martin to warn that Canadian companies who had contracts on the F-35 would suffer. Plans for a Super Hornet interim deal seemed to disappear.

As for Trudeau’s F-35 comment, Crisler has a diplomatic response: “The evidence is not consistent with a statement like that. If you’re not living it day-to-day, you might not see that.” At the Boeing tent at the Abbotsford air show, officials smiled while pointing out the F-35 wasn’t going to be showcased in a flight demonstration that weekend. In contrast, their Super Hornets roared back and forth in front of the crowds on both days of the show.

“This is a remarkable event where we can show what our aircraft are capable of,” said top Boeing official Roberto Valla.

A Boeing representative providing commentary for the demonstrations introduced the Super Hornet as a “fifth generation stealth fighter” — a dig at Lockheed, which also bills the F-35 as such.

Boeing officials were happy to outline their sales pitch: their aircraft is combat proven, less expensive than the F-35 and will be operating with the U.S. military until at least 2040.

During a demonstration in which a Postmedia reporter flew in one of the planes, Boeing pilot Ty Frautschi claimed the Super Hornet’s capabilities are suited to both combat and Arctic patrols; its two engines provide added safety for northern flights. The jet is designed to take the pounding from short landings on aircraft carriers, he said, which would also help it handle the short runways at the Canadian military’s forward operating locations in the Arctic.

Both Lockheed and Boeing are promoting their longtime presence in Canada as part of their pitch. By September, Crisler said, Canadian firms will have been awarded US$1 billion worth of work on the F-35.

For its part, in conjunction with the air show, Boeing announced the opening of a new software lab in Vancouver, including 50 new jobs.

Crowds gathered to gawk and take photos of the planes, though the two F-35s didn’t fly. The U.S. Air Force pilots that flew them up from Utah were under strict rules not to discuss the Canadian situation.

Instead, they chatted about the aircraft’s capabilities. F-35 pilot Lt.-Col. Curtis Pitts highlighted the plane’s powerful radar and sensors, and the stealth technology that provides it with increased survivability. If necessary, Pitts said, he’d be ready to go to war in the F-35 today. “It’s hard to find bad news” about the plane, said Pitts. “It’s all good news.”

In the end, though, the Canadian Forces will have bad news for one of its suitors.

Thursday, July 28, 2016

Liberals pay $33 million to stay in F-35 program

By: Lee Berthiaume, The Canadian Press

OTTAWA — Canada has so far forked over more than $311 million to develop the F-35 — without any guarantee it will actually buy the multibillion-dollar stealth fighter.

The most recent instalment was made June 24, when the Liberal government quietly paid $32.9 million to the U.S. program office overseeing development of the warplane, despite having promised during last year's election campaign not to buy the F-35.

The contribution keeps Canada at the table as one of the nine partners in the project for the next year. Partners get a discount when purchasing the stealth fighter, and have access to billions of dollars in contracts associated with producing the plane.

Those potential industrial benefits are a big part of the reason why Canada continues to pay into the program, said Jordan Owens, a spokeswoman for Defence Minister Harjit Sajjan. The government says Canadian companies have secured US$812 million in contracts since Canada's first F-35 payment in 1997.

"New skills and technologies gained through access to the program have helped position Canadian industry to take advantage of other advanced aerospace and defence projects," Owens added in an email.

Being a partner, however, does not guarantee future work.

U.S. defence giant Lockheed Martin, which makes the F-35, warned last month that future work would be directed to other countries if Canada chooses not to buy the stealth fighter.

Remaining at the table makes sense if there is a chance Canada will buy the plane, said former Defence Department procurement chief Alan Williams.

"But if they've already made up their mind that they're going to buy something else, then it's a waste of money."

During the campaign, the Liberals promised not to buy the F-35 and to hold a competition to replace the existing fleet of aging CF-18 fighters. Experts say that has put the government in a bind, since there's a real chance the fighter would come out on top in an open and fair competition.

The government recently launched consultations with jet fighter manufacturers to address what Sajjan has described as a shortage of available CF-18s. But some worry the consultations are more about giving the Liberals political cover to buy a plane other than the F-35 without holding a competition.

Owens said no decisions have been made in replacing the CF-18s. The five companies involved in the consultations are to submit details about their aircraft by Friday.

Wednesday, July 6, 2016

Defence Minister to Make Announcement Regarding CF-18 Replacememt

By: Lee Berthiaume, The Canadian Press

Defence Minister Harjit Sajjan will shed some light on how the government plans to replace Canada's aging fighter jets in an address to defence and aerospace industry officials Wednesday.

The much-anticipated update will not include an announcement on what aircraft will replace Canada's CF-18s, said Sajjan's spokeswoman, Jordan Owens. The minister will instead lay out what "short-term next steps" the government intends to take on the file.

The Liberals have been under pressure to say something about the replacement plan since reports last month that they were considering buying Boeing Super Hornet fighter jets without a competition.

The government has insisted no decision has been made, but it also says new warplanes are urgently needed to address a "gap" in the air force's fighter jet capabilities. In particular, the Liberals have said there aren't enough CF-18s to meet all of Canada's defence commitments.

Critics, however, have pointed to Royal Canadian Air Force commander Lt.-Gen. Michael Hood's comments to the Commons defence committee in April as proof the Liberals are manufacturing a crisis.

Hood said the CF-18 fleet should be able to operate through 2025 thanks to a $500-million upgrade ordered by the Conservatives in 2014. Twenty-six out of 77 CF-18s have already undergone structural work to fly through the mid-2020s, and electronic upgrades are planned.

Owens said Sajjan's speech will provide more detail on the current state of the CF-18 fleet. The minister will also talk to industry representatives about other military procurement projects, many of which are facing delays and other problems.

The Liberals promised during last year's election that they would hold an open competition to replace the CF-18s. At the same time, they promised not to buy the F-35. This, however, created a potential legal situation if the government was seen to discriminate against the stealth fighter.

The F-35 has previously won competitions in South Korea, Japan and Denmark.

Postmedia reported in June that the government was considering whether to use an exemption in federal procurement laws to buy Super Hornets as an "interim" measure to address the capability gap. That would let it to sole-source the planes without fear of a lawsuit.

Prime Minister Justin Trudeau said in the House of Commons last month that the F-35 "does not work and is far from working." A few weeks later, he refused to say whether his government remains committed to holding an open competition to replace the CF-18s.

"We are working very, very hard and thoughtfully to ensure that we deliver to our forces the right jets the right way at the right price," he told reporters at the time. "That's what Canadians expect of us, and that's what we are going to be doing."

The previous Conservative government announced in 2010 that Canada would be buying 65 F-35 stealth fighters without a competition. The Liberals, who at the time were in third place in the House of Commons, were critical of not holding a competition.

Both Boeing and Lockheed Martin, the U.S. defence giant behind the F-35, have engaged in fierce lobbying and public relations campaigns to convince Canadians and politicians that their fighter jet is best for the country.

Monday, July 4, 2016

Poll: Canadians want open competition to pick new jet,

By: Daniel Leblanc, Globe and Mail

The Trudeau government will suffer a blow in public opinion if it skips an open competition and hand-picks the new fighter jets that will replace Canada’s fleet of CF-18s, a new poll paid for by a manufacturer has found.

The survey, conducted by Nanos Research, found large support for the position that the Liberal Party held in opposition, namely that the Canadian Forces should go to tenders to buy their next fighter jet. However, officials have refused in recent public comments to commit to a competition, insisting instead on the urgent need to fill a “capability gap” between the low number of available CF-18s and the demands of Canada’s NATO and NORAD commitments.

The poll of 1,000 Canadians was paid for by Lockheed Martin, the manufacturer of the stealth F-35, and provided in full to The Globe and Mail.

A Canadian CF-18 fighter takes off from CFB Trenton in Trenton. Ont. Thursday October 11, 2001. (KEVIN FRAYER/THE CANADIAN PRESS)

It found that 82 per cent of respondents would have a “negative or somewhat negative impression” of the government if it sole-sourced the purchase of new jet fighters to a company without competition. On the other hand, 97 per cent of respondents said it would be important or somewhat important for the government to launch an “open and transparent selection process” for the new fighter jets.

Pollster Nik Nanos said the Liberals are reaping what they sowed in opposition, when they lambasted the Conservative government for trying to buy F-35s without going to tenders. In the poll, 59 per cent of respondents said Canada would get poor or very poor “value for tax dollars” if it opted out of a competition.

“The risk for the government is that they engage in a potential sole-source [contract], which isn’t what Canadians would expect from a Trudeau government,” Mr. Nanos said in an interview. “Polling suggests that if they do sole-source it, there will probably be negative fallout for the Liberals.”

Mr. Nanos said he composed all of the questions that were asked between June 24 and 26. The random survey, conducted by telephone and online, offers a margin of error of plus or minus 3.1 percentage points, 19 times out of 20.

Both Lockheed Martin and Boeing, which manufacturers the Super Hornet, have been calling on the government to launch a competition for new military aircraft.

The opposition has accused the Liberal government of trying to rig the process to avoid purchasing F-35s, with Prime Minister Justin Trudeau and some of his key ministers dismissing the aircraft as overly pricey and risky.

When asked for the criteria that should guide the government’s choice, respondents to the poll favoured “asserting sovereignty over Canada’s North” (67 per cent), opting for the aircraft with the “most advanced technology” (65 per cent) and the one with the “greatest positive impact” on job creation (58 per cent). In contrast, selecting the “lowest cost” aircraft was deemed extremely important by only 20 per cent of respondents.

“What Canadians would like to see is a certain level of self-interest for Canada, which involves asserting sovereignty over Canada’s North and creating jobs that are connected to the most advanced technology out there,” Mr. Nanos said.

Both Boeing and Lockheed Martin have promoted their respective aircraft as being the best suited to patrol in the Arctic, and both argue they would offer the best package of technological benefits for Canadian industry.

Canadians do not seem to share the federal government’s sense of urgency on the file, as only 29 per cent of respondents said it was extremely important for the government to choose a new aircraft “as quickly as possible” to replace the CF-18s that were bought in the 1980s.

“People tend to equate making fast decisions with potentially not spending tax dollars wisely,” Mr. Nanos said. “The key message is let’s have a transparent and open process, make it competitive and take the time for the best solution to come over.”

In the last election, the Liberals made a clear promise that they would not buy the F-35. Instead, Mr. Trudeau proclaimed that a Liberal government would launch an “open and transparent competition to replace the CF-18 fighter aircraft.” However, he did not say what would happen if the F-35 were to win that competition.

In early June, Defence Minister Harjit Sajjan was twice asked whether he would pursue an “open” competition to buy new jets, and twice responded about the urgent need to replace the CF-18s to meet Canada’s international commitments.

“We are looking at a gap that we have to deal with. These jets should have been replaced a long time ago,” Mr. Sajjan said.

Tuesday, June 28, 2016

The F-35 may be about to face even more delays

By: JEREMY BENDER, Business Insider

The oft-troubled F-35 may be on the verge of facing an even greater series of delays that could affect the supply chain of the aircraft and work agreements with jet-partner Great Britain.

At the root of the problem is the still-unresolved issue of the F-35’s ejection seat, which runs the risk of causing fatal whiplash in pilots under 200 pounds.

The issue is most pronounced with lighter-weight pilots, with those weighing under 136 pounds now barred from flying the aircraft for safety concerns related to the F-35’s Martin-Baker ejection seat, Defence News reports.

The problem with the ejection seats has been known since at least October 2015. But so far, fixes from Martin-Baker have focused on small issues without resolving the overall design flaw that could cause the fatal whiplash, according to two anonymous officials who spoke to Defence News.

In light of this, the F-35 program has begun to look at other manufacturers for its ejection seats. Chiefly, the program is looking at the United Technologies ACES 5 model.

“We believe it is prudent to look at what it would take to qualify the ACES 5 seat as a potential risk mitigation step if additional things happen as we go through the testing of the Martin-Baker seat,” Air Force Lt. Gen. Arnold Bunch told Defence News. “We believe it’s prudent to determine what it would cost, how much [effect it has on] the schedule, what the timeline would be, if something else happened and we wanted to go a different way.”

Should the F-35 project decide to replace the F-35’s ejection seats, costs of the program could increase and the aircraft could take longer to deliver. Martin-Baker is a British company, and its role in the construction of F-35 jets allows Britain to reap economic benefits from being a part of the F-35 program. Should the project decide to scrap Martin-Baker and use United Technologies, a US company, then the UK could demand a greater work share in other portions of the F-35.
(Martin-BakerA test of the F-35 ejection seat.
This would likely drive up costs for the program, as the supply chain and logistics of the project would need to be significantly altered.

The risk of fatal whiplash was previously thought to be caused by a combination of the way in which the ejection seats rolled forwards combined with the weight of the F-35’s helmet.

During simulated low-speed ejections, the heavy forces at play during the acceleration or deceleration of the advanced fighter jet would snap the neck of lightweight dummies. The problem was initially thought to have been caused by the ejection seats rotating too far forward. This movement, combined with the force of ejecting from the aircraft, would snap the dummies’ necks.

However, Reuters reported in October 2015 that the risk from the ejection seats to even lighter pilots was still exceptionally small. Pilots weighing under 136 pounds had a one-in-50,000 chance of hurting their neck, while pilots weighing 146 to 165 pounds had a one-in-200,000 chance.